Industrial Projects

Lei Garden Food Factory Development
No.3, Dai Shun Street, Tai Po Industrial Estate, N.T
An E&M Package that includes HVAC, Automatic Control, Electrical, P&D and Fire Services. The existing building is a 4-storey factory with a total floor area of 7900m2. The E&M installation consists of 2no. of 1055 kW water-cooler chillers, 600 kVA Gensets, LV switchboards, kitchen exhaust fans, FS sprinkler system, P&D installation, staircase pressurization system (class B). Interfacing works between E&M and other services, e.g. waste water treatment plant which diverts treated waste water to use as make-up water for AC system, cold room and kitchen equipment (including compressors, retort machines, washing machines) which require the provision of ventilation, drainage, condensing water systems, etc.
Pharmaceutical Manufacturing Factory
No.7, Dai Shun Street, Tai Po Industrial Estate, N.T
An E&M Package that includes HVAC, BMS, Electrical, P&D and Fire Services. The project is a 4-storey existing building with a total floor area of 9000m2. The E&M installation consists of 4 no. of 1442kW water-cooled chillers, 2 no. of 281kW air-cooled chillers, generator sets, LV switchboards, chilled and condensing water pumps, fire services sprinkler system, plumbing and drainage system. Interfacing works between E&M installation and clean room system, of which ductwork, pipework and BMS system are provided at the appropriate location.
Maxim's New Food Factory Development
No.5, Dai Shun Street, Tai Po Industrial Estate, N.T.
The project consists of FH/HR/Sprinkler systems with over 3000 sprinkler heads, 26 no hydrants and 28 no of hose reels. AFA System with 259 no Alarm Bells, 94 no Break glass units, 153 no Smoke/Heat Detectors. There are FM200 System, Audio/Visual, Pipes and Accessories, LMCPs, Tanks, Pumps and Valves.

Nin Jiom Medicine Factory Phases I & II
50 Wang Lee Street, Yuen Long Industrial Estate
An E&M Package that includes HVAC, BMS, Electrical, ELV, Fire Services, P&D, Stream and Compressed Air. The services was installed within existing factory renovations and new buildings together connect with all kinds of building services in a very fast track requirement. FS inspection was successful after 8 months of work process. Water cooled chillers A/C packaged units for spot cooling in store racks, steam, compressed air systems. The total floor area is 21700m2.
Airport Freight Forwarding Centre (AFFC),
Chun Wan Road North
ACMV installation consists of nos of air-cooled chillers totalled 690 tonnes for the office tower and 6 sets staircase pressurization systems for the cargo freight stations.