Base Building MEP2 Installation Nominated Sub-Contract for Global Network Centre Development (Tier 3+)
Tseung Kwan O Industrial Estate tin, New Territories
An E&M package covering the installation of 70 CRAC Units ranging from 33kW to 112kW and 16 UPS (each rating at 500kVA) to serve 7 nos Data Hall with a total construction area of about 7000m2 serving a total number of racks of 1,120.
New Civil Aviation Department Headquarters (Tier 4)
Hong Kong International Airport
In anticipation of the projected air traffic in Hong Kong International Airport, the HK government replaced the existing air traffic control system and developed a New Headquarters for the Civil Aviation Department which housed all currently dispersed CAD functional divisions into a single location. The project was constructed with approximately 65,000 sq meter floor area.

The design and build scheme was in itself a big challenge, especially on areas where various services were simultaneously required and this scenario necessitated an accurate coordination skills and a firm knowledge of the entire building services, in order to minimize reworks and/or double handling of works, thus mitigated potential delays to the works programme.

The provision of 100 CRAC Units for the Data Centre with the cooling capacity ranging from 20kW to 40kW and heating capacity of 2kW was a challenge due to the the fact that technical requirements were more stringent than normal commercial CRAC units as they help to handle flight data involving risk of human lives than data centres which are for stocks and commercial information. Adding to the complexity of the air-conditioning system is the nature of the building’s location, which is situated on four portions, namely Sites A,B,C and the temporary construction works area. A fixed link bridge was designed to connect one building to another while an underground service tunnel connected Site A and Site B.
Prince of Wales Hospital
Shatin, New Territories
An E&M Package that includes HVAC, BMS, Electrical, ELV, P&D, Pneumatic Tube, Steam and Data Room. The works for this contract comprise of the design and construction of multi-storey acute hospital building for the Hospital Authority.

It comprises of about 800 beds in patient wards for medicine and therapeutics, surgery, cardiothoracic surgery, neurosurgery, orthopaedics and traumatology, infectious diseases, ICU, coronary care, diagnostic radiology and organ imaging, AED, anaesthesiology and operating theatre suite, ambulatory surgery, blood bank, pharmacy, theatre sterile supplies unit and mortuary. Three (3) nos. of CRAC Units are provided for Medical Data Centre.
The Western Corridor Passenger Terminal Building
Shenzhen-Hong Kong Border
An E&M Package that includes HVAC, BMS, Electrical, ELV, P&D, Smoke extraction, Solar Tube and Data Center. This is an ASD project built in Shenzhen and with a fast track programme consisting of 40,000sqm floor area for HK-PRC Passenger Terminal

There are 21 numbers CRAC units serving 7 Data Centres, for immigration, customs, police office, together with most E&M services.
Pok Oi Hospital
Yuen Long, N.T., Hong Kong.
An E&M Package that includes HVAC, BMS, Electrical, ELV, Pnematic Tube, Steam and Data Room. The Hospital consists of a 13-storey building with one and a half levels of basement, five stories of podium floors and seven floors with three ward wings on each floor.

It accommodates 622 impatient beds, Accident and Emergency Dep’t (AE), Specialist Outpatient Dep’t (SOPD), Dep’t of Radiology, Operating Theatre (OT) suites, Clinical lab, Physiotherapy, Occupational Therapy, Pharmacy, Central Sterile Supplies Dep’t (CSSD Kitchen, Canteen and car parking spaces. Four (4) nos. of CRAC Units are provided for Medical Data Centre
Hong Kong Science Park, Phase II, Main Works (Area B)
HVAC installation consists of Secondary Chilled Water Pump, Secondary Heating Water Pump, Air Handling Unit c/w UV lamps, air purifier and steam humidifier, Primary Air Handling Unit c/w Heat wheel, VAV box and VRV Indoor Unit, Heat Exchanger, CRAC Unit, Water Scrubber and Jet Fans.

Electrical installation consists of 3200A LV switchboards, 6 numbers of Standby/ Emergency generators with rating from 500kVA to 1000kVA, Busduct, Central Battery System (CBS), UPS, Active Harmonic Filter (AHF), AV System, Intercom, BRI System, Induction Loop and Emergency Call Bell.

Fire Services consists of Automatic Sprinkler System, Fire Alarm System, Fire Detection System, Fire Hydrant/Hosereel System, Fire Alarm Control, Total Gas Flooding Installation (FM200) and Portable Fire Extinguishers Installation.


Cyberport Development – Contract C1
Cyberport Road, Pok Fu Lam
ACMV installation consists of sea water cooled centrifugal chiller plant totalled 8500 tonnes and screw type air cooled chiler plant totalled 250 tonnes.

Electrical installation consists of 3,200A LV switchboards, standby / emergency generators with rating from 750 kVA to 1,500 kVA, UPS public address, SMARTV / BRI and emergency call bell system.

Fire Services installation consists of complete wet sprinkler, fire hydrant and hosereel system, manual fire alarm, visual fire alarm and addressable automatic fire detection and alarm system, portable fire extinguishers and pre-action sprinkler system.

Plumbing and Drainage installation consists of potable water supply, cleansing water supply, grey water, soil and waste disposal and rain water disposal (underground and above ground).

An E&M Package that includes HVAC, BMS, Electrical, ELV, P&D, Fire Services and Data Center.