Commercial
Hospital
Industrial
Institutional
Residential/Hotel
Data Center
Transportation
Public Service
New Building – Block P
United Christian Hospital Extension
ACMV installation consists of 3 nos. air-cooled chillers totalled 990 tonnes. AHU, VAV / CAV, FCU, a central low pressure hot water plant, extract ventilation systems, and cold rooms for kitchen

Electrical installation consists of 1 no. 2500A L.V. Main Switchboard, 1 no. of 700 kVA emergency generator and fuel tank system, lighting, power ,earthing and lightning protection system, nurse call and emergency call system, bedhead trunking , CABD, CCTV, security system and public address system.


Maxim's New Food Factory Development
No.5, Dai Shun Street, Tai Po Industrial Estate, N.T.
The project consists of FH/HR/Sprinkler systems with over 3000 sprinkler heads, 26 no hydrants and 28 no of hose reels. AFA System with 259 no Alarm Bells, 94 no Break glass units, 153 no Smoke/Heat Detectors. There are FM200 System, Audio/Visual, Pipes and Accessories, LMCPs, Tanks, Pumps and Valves.


New Campus Development at Chu Hai College
Tuen Mun, New Territories
The project which was finished in 2016 features facilities such as crossmedia visual production studio, architecture studios, civil engineering laboratories, language laboratory and computer centres. It also has a full range of supporting facilities such as library, indoor gymnasium, cafeteria, café as well as student dormitory and staff quarters.