Grade-A Office Building


New World Center Remodeling
Salisbury Road, TST, Kowloon
The project rises from the southern tip of Kowloon peninsula. It will be the tallest building in Tsim Sha Tsui upon completion and it is planned to create an intensified mixed-use district anchored with a prominent building alongside Victoria Harbour


Hang Seng Bank Commercial Development
113-115 Argyle Street, Kowloon K.I.L. No. 11028
This project is an A&A Work to the existing 30-storey building. Contract includes builder’s work, structural strengthening for PAU room and decoration works. MEP includes MVAC system, Electrical, ELV, BMS, Fire Services and Plumbing Installations. The MVAC has adopted the chilled ceiling system.

Redevelopment of UCB Building for Bank of East Asia
No. 31-37 Des Veoux Road Central
The project is situated near Central MTR station and served by various transport options. The building has a flexible workspace with state-of-the-art designs featuring curtain walls and glazed panels for maximum daylight penetration. There are over 20 floors dedicated to premium office space and 5 storeys for retail and commercial use.
Landmark East
How Ming Street, Kwun Tong
This project is a Grade A twin towers office building located in Kwun Tong District with 43 storeys in height and two basement level carparks. The total floor area is around 130,000 sq m with total cooling capacity of 7,000 TR comprised of 11 and 7 nos. water cooled chillers at Tower 1 and Tower 2 respectively. This contract commenced on Feb 2007 and completed on July 2008 with a very fast-track programme.


Clubs, Restaurants, Offices and Retail


Madame Fu, Tai Kwun, 10 Hollywood Road, Central, Hong Kong.
Fit-Out Works covering Fire Services and MVAC.
Club Lusitano
16 Ice House St, Central
ACMV installation consists of 267 tonne screw type air cooled chiller, water to water heat pump, AHU, mechanical ventilation and building management system.

Electrical installation consists of incoming supply system, switchboard, generator set, main and sub-main distribution system, power supply to various services, general lighting and small power, earthing and lightning protection, telephone, CABD, PA and CCTV system.

Fire Services installation consists of fire hydrant and hose reel system, automatic sprinkler system, automatic drencher sprinkler system for refuge floor, automatic fire detection and alarm system.

Plumbing and Drainage installation consists of potable water supply, cleansing water supply, A/C make up water supply, soil and waste disposal and rain water disposal.


Industrial Facilities


Lei Garden Food Factory Development
No.3, Dai Shun Street, Tai Po Industrial Estate, N.T
An E&M Package that includes HVAC, Automatic Control, Electrical, P&D and Fire Services. The existing building is a 4-storey factory with a total floor area of 7900m2. The E&M installation consists of 2no. of 1055 kW water-cooler chillers, 600 kVA Gensets, LV switchboards, kitchen exhaust fans, FS sprinkler system, P&D installation, staircase pressurization system (class B). Interfacing works between E&M and other services, e.g. waste water treatment plant which diverts treated waste water to use as make-up water for AC system, cold room and kitchen equipment (including compressors, retort machines, washing machines) which require the provision of ventilation, drainage, condensing water systems, etc.
Base Building MEP2 Installation Nominated Sub-Contract for Global Network Centre Development (Tier 3+)
Tseung Kwan O Industrial Estate tin, New Territories
An E&M package covering the installation of 70 CRAC Units ranging from 33kW to 112kW and 16 UPS (each rating at 500kVA) to serve 7 nos Data Hall with a total construction area of about 7000m2 serving a total number of racks of 1,120.
Jean-Marie Pharmacal Company Limited
No.7, Dai Shun Street, Tai Po Industrial Estate, N.T
An E&M Package that includes HVAC, BMS, Electrical, P&D and Fire Services. The project is a 4-storey existing building with a total floor area of 9000m2. The E&M installation consists of 4 no. of 1442kW water-cooled chillers, 2 no. of 281kW air-cooled chillers, generator sets, LV switchboards, chilled and condensing water pumps, fire services sprinkler system, plumbing and drainage system. Interfacing works between E&M installation and clean room system, of which ductwork, pipework and BMS system are provided at the appropriate location.
Maxim's New Food Factory Development
No.5, Dai Shun Street, Tai Po Industrial Estate, N.T.
The project consists of FH/HR/Sprinkler systems with over 3000 sprinkler heads, 26 no hydrants and 28 no of hose reels. AFA System with 259 no Alarm Bells, 94 no Break glass units, 153 no Smoke/Heat Detectors. There are FM200 System, Audio/Visual, Pipes and Accessories, LMCPs, Tanks, Pumps and Valves.


Nin Jiom Medicine Factory Phases I & II
50 Wang Lee Street, Yuen Long Industrial Estate
An E&M Package that includes HVAC, BMS, Electrical, ELV, Fire Services, P&D, Stream and Compressed Air. The services was installed within existing factory renovations and new buildings together connect with all kinds of building services in a very fast track requirement. FS inspection was successful after 8 months of work process. Water cooled chillers A/C packaged units for spot cooling in store racks, steam, compressed air systems. The total floor area is 21700m2.
Cyberport Development – Contract C1
Cyberport Road, Pok Fu Lam
ACMV installation consists of sea water cooled centrifugal chiller plant totalled 8500 tonnes and screw type air cooled chiler plant totalled 250 tonnes.

Electrical installation consists of 3,200A LV switchboards, standby / emergency generators with rating from 750 kVA to 1,500 kVA, UPS public address, SMARTV / BRI and emergency call bell system.

Fire Services installation consists of complete wet sprinkler, fire hydrant and hosereel system, manual fire alarm, visual fire alarm and addressable automatic fire detection and alarm system, portable fire extinguishers and pre-action sprinkler system.

Plumbing and Drainage installation consists of potable water supply, cleansing water supply, grey water, soil and waste disposal and rain water disposal (underground and above ground).

An E&M Package that includes HVAC, BMS, Electrical, ELV, P&D, Fire Services and Data Center.
Airport Freight Forwarding Centre (AFFC),
Chun Wan Road North
MVAC installation consists of several nos of air-cooled chillers totaling to 690 TR for the office tower and 6 sets staircase pressurization systems for the cargo freight stations.