Commercial
Hospital
Industrial
Institutional
Residential/Hotel
Data Center
Transportation
Public Service
HK Baptist University Campus Development
Baptist University Road
An E&M Package that includes HVAC, Electrical, and Fire Services. The project comprises two numbers of building, one is “Main Building” which is the academic building with gross floor area of 2,400 square metres and the other is ‘Annex Block” housing a sports centre and an exhibition hall.
Cyberport Development – Contract C1
Cyberport Road, Pok Fu Lam
ACMV installation consists of sea water cooled centrifugal chiller plant totalled 8500 tonnes and screw type air cooled chiler plant totalled 250 tonnes.

Electrical installation consists of 3,200A LV switchboards, standby / emergency generators with rating from 750 kVA to 1,500 kVA, UPS public address, SMARTV / BRI and emergency call bell system.

Fire Services installation consists of complete wet sprinkler, fire hydrant and hosereel system, manual fire alarm, visual fire alarm and addressable automatic fire detection and alarm system, portable fire extinguishers and pre-action sprinkler system.

Plumbing and Drainage installation consists of potable water supply, cleansing water supply, grey water, soil and waste disposal and rain water disposal (underground and above ground).

An E&M Package that includes HVAC, BMS, Electrical, ELV, P&D, Fire Services and Data Center.
Maxim's New Food Factory Development
No.5, Dai Shun Street, Tai Po Industrial Estate, N.T.
The project consists of FH/HR/Sprinkler systems with over 3000 sprinkler heads, 26 no hydrants and 28 no of hose reels. AFA System with 259 no Alarm Bells, 94 no Break glass units, 153 no Smoke/Heat Detectors. There are FM200 System, Audio/Visual, Pipes and Accessories, LMCPs, Tanks, Pumps and Valves.