Sun Hung Kai Properties Ltd.


Oscar By The Sea – Phases I & II
8 Pung Loi Road, TKO
ACMV installation consists of 2 nos. air cooled chiller totalled 230 tonnes, AHU/PAU and FCU and heat pump with cooling capacity 130 kW for the Club House area and split type A/C units for the residential flats.


Residential Development in Cheung Muk Tao
ACMV installation consists of Multi zoning VRV type air conditioning, General Ventilation & Exhaust system for Refuse Collection Chamber and Vehicle exhaust system for carpark with gas detection system.


Fairmont Terrace
127 Repulse Bay Rd, Repulse Bay
ACMV installation consists of air cooled heat pump with the cooling capacity 142 kW and heating capacity 147 kW, AHU and FCU for the Club House area, outdoor VRV and indoor units for the residential flat.