Synco


Jean-Marie Pharmacal Company Limited
No.7, Dai Shun Street, Tai Po Industrial Estate, N.T
An E&M Package that includes HVAC, BMS, Electrical, P&D and Fire Services. The project is a 4-storey existing building with a total floor area of 9000m2. The E&M installation consists of 4 no. of 1442kW water-cooled chillers, 2 no. of 281kW air-cooled chillers, generator sets, LV switchboards, chilled and condensing water pumps, fire services sprinkler system, plumbing and drainage system. Interfacing works between E&M installation and clean room system, of which ductwork, pipework and BMS system are provided at the appropriate location.