New World Center Remodeling
Salisbury Road, TST, Kowloon
The project rises from the southern tip of Kowloon peninsula. It will be the tallest building in Tsim Sha Tsui upon completion and it is planned to create an intensified mixed-use district anchored with a prominent building alongside Victoria Harbour


Hang Seng Bank Commercial Development
113-115 Argyle Street, Kowloon K.I.L. No. 11028
This project is an A&A Work to the existing 30-storey building. Contract includes builder’s work, structural strengthening for PAU room and decoration works. MEP includes MVAC system, Electrical, ELV, BMS, Fire Services and Plumbing Installations. The MVAC has adopted the chilled ceiling system.

Development of Hong Kong Science Park, Phases 3a and 3b
Pak Shek Kok, Tai Po
MVAC installation consists of chilled units of solar absorption type and water cooled cooling towers, thermal energy storage panel with phase charge material, solar hot water collector, AHU c/w heat wheel and VRV indoor unit.

Electrical installation consists of 3200A LV switchboards, 6 numbers of standby/emergency generators with rating from 650kvA to 100kVA, busduct, active harmonic filter (AHF) and central lighting control.


Redevelopment of UCB Building for Bank of East Asia
No. 31-37 Des Veoux Road Central
The project is situated near Central MTR station and served by various transport options. The building has a flexible workspace with state-of-the-art designs featuring curtain walls and glazed panels for maximum daylight penetration. There are over 20 floors dedicated to premium office space and 5 storeys for retail and commercial use.
China Construction Bank
3 Connaught Road, Central
A 28-storey class ‘A’ commercial building in Central is cooled down with 4 nos. water cooled chillers at B4 and 3 nos. air cooled chillers on the roof. The whole building is installed with VAV Box, B1 – B3 basement carpark with smoke extraction system and staircase pressurization.


Landmark East
How Ming Street, Kwun Tong
This project is a Grade A twin towers office building located in Kwun Tong District with 43 storeys in height and two basement level carparks. The total floor area is around 130,000 sq m with total cooling capacity of 7,000 TR comprised of 11 and 7 nos. water cooled chillers at Tower 1 and Tower 2 respectively. This contract commenced on Feb 2007 and completed on July 2008 with a very fast-track programme.


Hong Kong Science Park, Phase II, Main Works (Area B)
HVAC installation consists of Secondary Chilled Water Pump, Secondary Heating Water Pump, Air Handling Unit c/w UV lamps, air purifier and steam humidifier, Primary Air Handling Unit c/w Heat wheel, VAV box and VRV Indoor Unit, Heat Exchanger, CRAC Unit, Water Scrubber and Jet Fans.

Electrical installation consists of 3200A LV switchboards, 6 numbers of Standby/ Emergency generators with rating from 500kVA to 1000kVA, Busduct, Central Battery System (CBS), UPS, Active Harmonic Filter (AHF), AV System, Intercom, BRI System, Induction Loop and Emergency Call Bell.

Fire Services consists of Automatic Sprinkler System, Fire Alarm System, Fire Detection System, Fire Hydrant/Hosereel System, Fire Alarm Control, Total Gas Flooding Installation (FM200) and Portable Fire Extinguishers Installation.


Cyberport Development – Contract C1
Cyberport Road, Pok Fu Lam
ACMV installation consists of sea water cooled centrifugal chiller plant totalled 8500 tonnes and screw type air cooled chiler plant totalled 250 tonnes.

Electrical installation consists of 3,200A LV switchboards, standby / emergency generators with rating from 750 kVA to 1,500 kVA, UPS public address, SMARTV / BRI and emergency call bell system.

Fire Services installation consists of complete wet sprinkler, fire hydrant and hosereel system, manual fire alarm, visual fire alarm and addressable automatic fire detection and alarm system, portable fire extinguishers and pre-action sprinkler system.

Plumbing and Drainage installation consists of potable water supply, cleansing water supply, grey water, soil and waste disposal and rain water disposal (underground and above ground).

An E&M Package that includes HVAC, BMS, Electrical, ELV, P&D, Fire Services and Data Center.
Club Lusitano
16 Ice House St, Central
ACMV installation consists of 267 tonne screw type air cooled chiller, water to water heat pump, AHU, mechanical ventilation and building management system.

Electrical installation consists of incoming supply system, switchboard, generator set, main and sub-main distribution system, power supply to various services, general lighting and small power, earthing and lightning protection, telephone, CABD, PA and CCTV system.

Fire Services installation consists of fire hydrant and hose reel system, automatic sprinkler system, automatic drencher sprinkler system for refuge floor, automatic fire detection and alarm system.

Plumbing and Drainage installation consists of potable water supply, cleansing water supply, A/C make up water supply, soil and waste disposal and rain water disposal.