Residential/Hotel Projects

Air Conditioning and Ventilation Systems Term Maintenance Contract for 2017/2020
The Project includes the conservation of 16 buildings of historical or architectural significance and several open spaces on the approximately 3.37-acre site. To support the activities on the revitalized site, two new buildings will be built to provide additional floor space for contemporary art and exhibition areas and plant rooms, and will help to reduce interventions to the historic buildings.

It is aimed that the new buildings will carefully inject fresh elements within the fabric of the existing buildings, adding new functions and synergy to the unique historic character of the site.

Retail and Hotel Development Development for Tung Chung Town Lots #2 and 11
A construction of 12-storey superstructure works of the retail and hotel building with 2-storey basement carpark, landscaping work, swimming pool comprising gross floor area of approximately 50,130 m2 and alteration and additional works for CityGate Tung Chung.

Public Rental Housing Redevelopment Pak Tin Estate, Phases 7 & 8
The Contract includes the whole of the materials and labour necessary for air conditioning and ventilation installation, and its operation and maintenance for 24 months after completion of installation.

This covers areas of two to four-storey’s non-domestic podium consisting of Property Management Agency (PMA) office at LG1; A Wet Market at LG3 of Block 4; Retail shops; A carpark at LG1 of Block 2; District Management office at LG1 of Block 2; Estate Management Office at LG1 of Block 2 and; Public Transportation Interchange (PTI) at LG3 and LG2 of Block 2.

Sai Kung Hotel Development Lot No. 1950 in DD221, Wai Man Road, Sai Kung, N.T.
The hotel comprises of function rooms, business centers, wedding campus and 261 guest rooms with a maximum gross floor area 26,910 square meters. It is sitting on a site area of about 17,940 square metres.

logo1.png
Dragon Ranges Residential Development 33 Lai Ping Road, Kau To Shan
This project comprises a total of 973 residential units with sizes ranging from approximately 450 sq. ft. to 1,500 sq. ft., available in one-, two-, three- and four-bedroom designs and also has different types of special units.

The resident clubhouse indoor layout has an area approximately 36,000 sq. ft., providing indoor swimming pool, 365 Gym, Banquet Room, Sports Court. Outdoor facilities include an over 10,000 sq. ft. Central Park, BBQ Garden, Pet Garden, as well as Kiddie World.

Holiday Inn Golden Mile Chiller Replacement
50 Nathan Rd, Tsim Sha Tsui
MVAC installation consists of “Carrier” air cooled package screw type chillers (380RT).

Property Development at TW7 Tsuen Wan West Station (City Point) 48 Wing Shun Street, Tsuen Wan, N.T., Hong Kong
The new residential development comprises of 7 towers with 44-48 storeys for a total of 1,717 units.

Tai Wai Residential Dev.-Sheung Hui Festival City Phase II Tai Wai STTL No 529, Shatin, Hong Kong.
A four-block project with up to 52nd storey for a total of 1,368 units. This is complete with modern amenities like indoor swimming pool, jacuzzi, sauna, steam room, computer rooms, home theatre, karaoke, basketball court and bowling alleys.

Kowloon Tong Meridian Hill
Broadcast Drive 81, Hong Kong
This includes HVAC, Electrical and ELV Services. The development has a total of 103 nos of deluxe domestic flats and a club house, equipped with 2 nos 40 TR. VRV and split air-conditioning system.
Student Hostels Phase I
City University of Hong Kong
ACMV installation consists of VRV A/C units, split and window types A/Cunits for mechanical ventilation plant rooms and toilets, and fresh air for the VRV A/C and split type A/C units.

Electrical installation consists of 2500A LV Switchboard, 910 kVA emergency generator, lighting, power, earthing, lightning protection, emergency call, CCTV and security, PA, Building monitoring, CABD, Carpark control, Smart card for A/C units and visitor panel system.

Fire Services installation consists of wet sprinkler, street fire hydrant, fire hydrant and hosereel system, manual fire alarm, visual fire alarm and addressable automatic fire detection and alarm system, portable fire extinguishers and automatic fire extinguisher unit for fuel tank room.

Oscar By The Sea – Phases I & II
8 Pung Loi Road, TKO
ACMV installation consists of 2 nos. air cooled chiller totalled 230 tonnes, AHU/PAU and FCU and heat pump with cooling capacity 130 kW for the Club House area and split type A/C units for the residential flats.

Ocean Shore
88 O King Road, Tiu Keng Leng, Kowloon
ACMV installation consists of 3 nos. air cooled chiller totalled 379 tonnes, AHU and FCU for Club House, split type Air Conditioning Units for the entrance Lift Lobby, DIDW centrifugal fan, jet fan and jet nozzle for car park area.

Residential Redevelopment of N018A, La Salle Road, Kowloon
ACMV installation consists of VRV air conditioning system, Ventilation system.

Electrical installation consists of Power, Lighting, CCTV, Burglar Alarm and Video Door Phone and CABD system.

Residential Development in Cheung Muk Tao
ACMV installation consists of Multi zoning VRV type air conditioning, General Ventilation & Exhaust system for Refuse Collection Chamber and Vehicle exhaust system for carpark with gas detection system.

Fairmont Terrace
127 Repulse Bay Rd, Repulse Bay
ACMV installation consists of air cooled heat pump with the cooling capacity 142 kW and heating capacity 147 kW, AHU and FCU for the Club House area, outdoor VRV and indoor units for the residential flat.